Technical drawings [52]
| BIM Amphibia applied on diaphragm walls.zip | Technical drawings | Download |
| BIM Dehumidification cycle Calibro PE and chemical injection Triplezero.zip | Technical drawings | Download |
| BIM Facade waterproofing CP1 + Flexonet.zip | Technical drawings | Download |
| BIM Precast application of Amphibia waterproofing membrane.zip | Technical drawings | Download |
| BIM Reinforcement of wooden slabs with Fibro HFR.zip | Technical drawings | Download |
| BIM Tanking system low thickness with Amphibia and Fibro HFR.zip | Technical drawings | Download |
| BIM Tanking system on masonry structure with Amphibia.zip | Technical drawings | Download |
| BIM Tanking system sealing of movement joint with Bi Flex.zip | Technical drawings | Download |
| BIM Terrace waterproofing with Aquascud.zip | Technical drawings | Download |
| DS_Air shaft with AMPHIBIA and PLASTIVO_660_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA 3000 GRIP – Intermediate slab_659_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA 3000 GRIP – Raft foundations at different heights_684_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA 3000 GRIP pre-applied installation – sealing of penetrations_449_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA 3000 GRIP pre-applied installation – sealing penetrations with pipe sleeve_682_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA installed on slurry walls_existing structures – sealing of penetrations_665_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA with anchored piling_661_EN.pdf | Technical drawings | Download |
| DS_AMPHIBIA with diaphragm walls_443_EN.pdf | Technical drawings | Download |
| DS_AQUASCUD SYSTEM 420 – splitting joint sealing_519_EN.pdf | Technical drawings | Download |
| DS_AQUASCUD SYSTEM/ sealing of corner_199_EN.pdf | Technical drawings | Download |
| DS_BREAK – Axonometry_667_EN.pdf | Technical drawings | Download |
| DS_Connection between AMPHIBIA 3000 GRIP and bituminous waterproofing membranes_683_EN.pdf | Technical drawings | Download |
| DS_Connection between AMPHIBIA under the raft foundation and AMPHIBIA installed vertically on the internal side of formworks before casting the walls without raft foundation toe_517_EN.pdf | Technical drawings | Download |
| DS_Connection between AQUASCUD SYSTEM on the sloped screed and AMPHIBIA 3000 GRIP on foundation wall_658_EN.pdf | Technical drawings | Download |
| DS_Construction joint with AMPHIBIA 3000 GRIP under the slab and PLASTIVO on the foundation walls_516_EN.pdf | Technical drawings | Download |